Industrial project intelligence

Turn a brief into a project plan
you can defend.

Feasimetric builds a real Microsoft Project plan — work breakdown, schedule, and a cost basis from your own Bill of Materials — grounded in how real capital projects actually ran. In minutes, for a fraction of a $20,000 study.

Contribute a project →
Feasimetric · specrev 0.1
Input
a brief — plus a Bill of Materials, if you have one
Output
a Microsoft Project file — WBS, dependencies, resources
Cost basis
your BoM through a real delivered-cost waterfall
Grounded in
real completed capital-project outcomes
Turnaround
minutes, not weeks

A — Why it's different

Computed from your numbers.
Not interpolated. Not guessed.

Most estimators interpolate from generic tables. Lately, some just let a chatbot invent the figures. Feasimetric does neither — every number has somewhere it came from.

01 / COMPUTED

Traceable to a line item

Cost is built from your Bill of Materials through a real delivered-cost waterfall — freight, duties, banking, contingency. Every figure traces back to a line, a factor, and its source.

02 / REAL DELIVERABLE

An MS Project file

You get a plan you can open, edit, and present — work breakdown, dependencies and resources — not a static PDF you can't work with.

03 / GROUNDED

Modelled on real builds

Structured and benchmarked against how actual capital projects landed — not textbook averages. And honest about the limits of what it has seen.


B — How it works

Four steps to a defensible plan.

01

Brief

Describe the project. Attach a Bill of Materials if you have one — Feasimetric works with or without it.

02

Clarify

A short, adaptive set of questions fills only the gaps that matter. Anything still unknown is recorded as an explicit assumption — never silently invented.

03

Plan

Feasimetric structures the work breakdown, sequences it, and costs it from your numbers.

04

Open in MS Projectstructure free · costed plan paid

Download the file. See the full structure for free; unlock the costed, scheduled plan when it's worth it.


C — The deliverable

A cost basis you can put your name on.

Ex-works price is only part of the story. Feasimetric applies the full delivered-cost waterfall the way real projects pay it — so the number you take to your board reflects what the build will actually cost on site.

Delivered-cost waterfall · per line
Equipment, ex-worksbase
Freight & insurance+ CIF
Clearing / agent+ 2.5%
Banking / LC+ 5%
Contingency+ 15%
Delivered to site — traced= defensible

Help build the benchmark

Run a capital project? Make Feasimetric sharper.

Feasimetric gets more accurate with every real plan it learns from. Contribute one — even reconstructed from memory — and you'll get early access and credit toward your own plans. Your data is yours: consented, anonymised, and never shared without permission.